APREN AT THE MEDIA

TV
Radio
Press
Radio
SEE ALL
Floating solar power plant in Alqueva
Statements by Pedro Amaral Jorge, president of APREN, about the floating solar power plant of Alqueva, in Alentejo.
Energy transition
Pedro Amaral Jorge does not understand how the theme of energy transition is not part of the election campaign.
Press
SEE ALL
2025-07-25
The blackout only increased the need to accelerate the strengthening of the electrical system.
Pedro Amaral Jorge, president of APREN, refuses to speculate on the causes of the blackout.
2025-07-24
Investors are desperate for the offshore wind auction
They want a calendar for the several stages of the process so they can plan the procedure in advance. They advocate for the launch of the first phase at the beginning of 2026.